Praag

Hilton Hotel Praag

Hilton Hotel Praag
Execution
Rollecate Export
Client
Hilton Hotel Praag
Architect
Ian Bryan Architects
Contractor
Quinn Property Ireland
Type
Export

The facade renovation of approximately 4,000 m2 obsolete natural stone cladding. This project was inventoried in advance by preparing a quality report and three-dimensional surveying of the existing structure.

The existing wall cover was removed down to its shell, to be replaced with high-quality insulation and an aluminium carrier. These high quality aluminum ceramic wall tiles are structurally bonded.

All this is done while the 5 star hotel and associated conference center was still operating.

Specifics

  • Renovation project
  • Excellent insulation
  • Aluminium draagsysteem
  • Structureel verlijmde keramische geveltegels